Work on Valkyria’s tunnel continues
At Liseberg the work on the tunnel for Valkyria continues, after the last section of track was put into place last week. The crew is also working on the electrics and the station. Source: https://www.facebook.com/groups/495578810813841/permalink/585330168505371/
Kopieer en plak deze URL in je WordPress site om in te sluiten
Kopieer en plak deze code in je site om in te sluiten